03 / SOLUTION
Construction and projects
Schedule, budget, materials, contractors, BIM, and documents connected to actual execution.
For: Developers, general contractors, technical clients, and owners of major assets. This is not a ready-made module — the environment is engineered around the client’s data and workflows.
Illustrative interfaceCONTROL / 01
OBJ-01
Project
OBJ-02
Work package
OBJ-03
Material
01Connect plan and actuals
02Process documents
03Identify risk
01 / WHAT BECOMES CONNECTED
Real operating objects in one model.
01Project
02Work package
03Material
04Contractor
05Exception
02 / OPERATING WORKFLOW
- 01Connect plan and actuals
- 02Process documents
- 03Identify risk
- 04Assign an owner
- 05Verify closure
03 / SOURCE SYSTEMS
Use existing systems without forcing a full replacement.
ERPSRC-01
BIMSRC-02
Project scheduleSRC-03
Execution documentsSRC-04
04 / FIRST PROJECT
SMALLEST REALISTIC ENTRY
A project control tower for one site.
Delays, overruns, and material shortages become managed events.
START WITH A WORKFLOW
Examine this workflow using your data.
Define the objects, sources, decisions, actions, roles, and the boundary of a first pilot.